Duty points, not adjectives

These are the kinds of jobs AMCO pumps are selected for, written the way an engineer reads them: flow, head, fluid, duration, package and result. Bring us your duty point and we will tell you which model fits and where it sits on the curve.

Sewer bypass

Gravity main replacement, municipal collection system

Flow
4,200 GPM
Total head
95 ft
Fluid
Raw sewage, rag and grit
Duration
7 weeks, continuous
Package
2 × APCD150 + 1 standby

The problem

A 30-inch gravity main had to be taken out of service while the contractor replaced 900 ft of pipe. An overflow would have meant a reportable event and a stop-work order.

What we supplied

Two auto-prime APCD150 units carried the flow with a third on automatic standby, level-controlled from float switches, with air-release valves and check valves on the discharge manifold.

The outcome

Zero overflow events across the bypass. Automatic standby start-up removed the need for a night watchman on the sump, and the standby unit ran only 11 hours across the whole job.

Construction dewatering

Deep foundation excavation, coastal site

Flow
1,800 GPM
Total head
70 ft
Fluid
Silty groundwater, fine sand
Duration
5 months
Package
3 × STP6, diesel and electric

The problem

Groundwater inflow kept the excavation below grade wet and the previous pumps were losing prime overnight as the sump level dropped.

What we supplied

Self-priming STP6 trash pumps handled the sand-laden water, with suction strainers sized to keep velocity down and one electric unit run off site power to reduce fuel and noise near occupied buildings.

The outcome

Continuous dry excavation with no unplanned stoppages attributed to dewatering, and seal life on the wear parts ran the full mobilisation on the scheduled kit change.

Mining & industrial

Tailings pond transfer during storm recovery

Flow
2,600 GPM
Total head
215 ft
Fluid
Abrasive slurry, 6% solids
Duration
3 weeks
Package
2 × APHH5614 in series-ready set

The problem

Storm water had to be moved up a long uphill run to a holding pond within a regulator deadline, at a head no standard trash pump could reach.

What we supplied

High-head APHH units on trailers, hard-piped for the lift, with hammer unions and a check valve arrangement chosen for the static head so shutdown did not slam the line.

The outcome

Pond level was drawn back inside the permitted freeboard ahead of the deadline, with wear parts pulled from Houston stock in two days when the abrasive duty shortened the first seal change.

Note

Representative applications

The duty figures above describe representative projects for these pump series rather than named customer contracts; project names and references are shared on request, with the customer's permission. Send us a real duty point and we will confirm model selection against the published curve.

  • Pump selector

    Enter flow, head, fluid and solids to get recommended models with curves.

  • Pump series

    Auto-prime, self-prime trash, high-head and utility pumps, diesel or electric.

  • Manuals & submittals

    IOM manuals, wear-part lists, submittal packages and CSI spec language.